Field batch 4: deferred routines of batch 3 and the next field order #59

Closed
opened 2026-11-05 06:53:44 +00:00 by Gatchan · 1 comment
Owner

Continue the field port after #56 (PR #57), same method and validation (draftc -> draft_check -> naming/restructuring -> portbridge -> groundtruth + shadow on the 5 routes US/JP, fuzz, instruction coverage, portstyle, debug/clang -LE slow).

Routines deferred by batch 3: MoveObjs, _c0714a, LoadLetterGfx, UpdateDlgWindow, UpdateSpotlights, CheckCollosions, TfrDlgTextGfx, TfrDlgCursorGfx, ClearDlgTextRegion (second DMA upload style), DrawTimer (divider, now compared by #58). Then the next routines of docs/coverage.md field order, up to about 30 routines. Frame-crossing routines are skipped (#37); every skip is listed with its reason. Original bugs found go to re/known-bugs.toml.

Continue the field port after #56 (PR #57), same method and validation (draftc -> draft_check -> naming/restructuring -> portbridge -> groundtruth + shadow on the 5 routes US/JP, fuzz, instruction coverage, portstyle, debug/clang `-LE slow`). Routines deferred by batch 3: MoveObjs, _c0714a, LoadLetterGfx, UpdateDlgWindow, UpdateSpotlights, CheckCollosions, TfrDlgTextGfx, TfrDlgCursorGfx, ClearDlgTextRegion (second DMA upload style), DrawTimer (divider, now compared by #58). Then the next routines of docs/coverage.md field order, up to about 30 routines. Frame-crossing routines are skipped (#37); every skip is listed with its reason. Original bugs found go to re/known-bugs.toml.
Author
Owner

Merged in PR #62: 20 chapter 1 field routines. Shadow on the chapter 1 routes, 66 ports: US 1 866 252 calls, JP 1 694 094, 0 mismatch, 0 fallback; fuzz 0 mismatch; instructions US 1165/1205, JP 1021/1205; debug/clang ctest -LE slow 27/27. Skips listed in docs/ports.md.

Merged in PR #62: 20 chapter 1 field routines. Shadow on the chapter 1 routes, 66 ports: US 1 866 252 calls, JP 1 694 094, 0 mismatch, 0 fallback; fuzz 0 mismatch; instructions US 1165/1205, JP 1021/1205; debug/clang ctest -LE slow 27/27. Skips listed in docs/ports.md.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
Gatchan/FF6Portage#59
No description provided.